Cypress Trunk Sewer Project
Crews continue to work at the intersection of Denni St. and Lincoln Ave. in the City of Cypress on manhole improvements and pipe replacement.
Please continue to check this webpage for the latest schedule updates and information.
Upcoming Work
The underground bypass installation work originally scheduled for late November on Denni St. between Willow Dr. and Crescent Ave. is now expected to begin in early January. Consider it OC San’s holiday gift to the neighborhood!
Crews will be returning to Denni St. to install a bypass system that will maintain continuous sewer service during construction. Once the bypass system is in place, sewer pipe replacement will begin and continue in three phases. More information about this work will be provided as construction approaches.
Current Work
Location: Denni St., from Rainier Dr. to the entrance of Forest Lawn Cemetery
Crews are installing shoring and bracing for access pits needed for pipe replacement work. Once this work is complete, crews will begin replacing the pipe. Manhole improvement work is ongoing in this area.
A temporary bypass system remains in place and operates continuously to safely reroute sewer flow and maintain uninterrupted sewer service during construction.
To minimize impacts on the community, work is being done during the night.
- When: Ongoing and lasting until late December*
- Work Hours: Sunday night – Friday morning, 8:00 p.m. – 6:00 a.m.*
- No work will take place Wednesday through Saturday of Thanksgiving week.
- Work Impacts:
- Temporary and permanent traffic control with reduced lanes
- Permanent traffic control will be located around the bypass systems to protect crews and equipment, and may extend as far south as Surrey Dr.
- No left turns onto Denni St. from Rainier Dr. or Casa Grande Cir. northern driveway
- Other left turns may be restricted during work hours; please follow all posted signs
- Casa Grande Apartments Access:
- Residents traveling northbound on Denni St. should access the complex from the southern driveway of Casa Grande Cir. Other left turns into the complex will be restricted
- Increased noise and activity, including noise from the bypass pumps
- Temporary and permanent traffic control with reduced lanes
*All dates and times are subject to change due to operational factors or inclement weather.
Project Description:
The regional sewer line in the cities of Cypress, Los Alamitos, and La Palma is approximately 50 years old and in need of upgrades. The Cypress Trunk Sewer Project will focus on enhancing about 7 miles of sewer, replacing portions of the pipe with larger diameter pipe to increase the capacity, or rehabilitating other segments of pipe to extend the life of the sewer system. Approximately 100 manholes will also be replaced and/or rehabilitated. These repairs will extend the life of the sewer pipes by another 50 years.
Schedule:
Construction began in Summer 2025 and is anticipated to last approximately 3 years.
Local Sewer Provider:
- City of Cypress – Maintenance Division – (714) 229-6760
- City of La Palma – Public Works Division – (714) 690-3310
- City of Los Alamitos – Rossmoor / Los Alamitos Area Sewer District – (562) 431-2223
Project Location
Stay In The Know
Community Liaison:
(714) 378-2965
Email:
constructionhotline@ocsan.gov
Sign up for text alerts:
click here
Signup for Email Notification
Site Location
Construction Schedule
2025-2028
Construction Budget
$35 million