Los Alamitos Trunk Sewer Construction Project – July 12, 2023

Home >> News >> Los Alamitos Trunk Sewer Construction Project – July 12, 2023

Los Alamitos Trunk Sewer Project banner

The regional sewer project on Seal Beach Blvd. is part of OC San’s commitment to continue to provide reliable sewer services to those within its service area. Thank you for your patience as we work to improve Orange County’s infrastructure. 

City of Seal Beach

 Old Ranch Pwky. and I-405 NB on-ramp – NIGHTWORK 

  • When: July 18 – Week of July 24*
  • Work Hours: Monday – Friday, 7 p.m. – 6 a.m.
  • Impacts: Lane closures – allow extra time to reach your destination.

 

Seal Beach Blvd. between St. Cloud Dr. and Lampson Ave. – NIGHTWORK

            NO NIGHT WORK UNTIL WEEK OF JULY 17

Manholes are necessary to maintain the regional sewer system. There is a current manhole at the intersection of Seal Beach Blvd. and St. Cloud Dr., the location makes access difficult, dangerous, and impactful to the public. A new manhole will be constructed south of St. Cloud Dr. and the existing manhole will be abandoned. Due to the nature of the work, and to ensure the safety of the crews, this phase of work will require temporary traffic control and lane closures as the activity is occurring.

  • When: Work resuming week of July 17 – August 2023*
  • Where: Southbound Seal Beach Blvd. from St. Cloud Dr. to Lampson Ave.
  • Work Hours: Monday – Friday, 6 p.m. – 6 a.m.
  • Impacts:
  • Lane closures – allow extra time to reach your destination.
  • Noise – mitigations measures will be in place; however, it is possible construction activity will still be heard.
  • Sidewalk closures are necessary for this phase of work. For your safety please do not enter construction areas, use alternate route.

manhole rehab work area map in city of seal beach 

ONGOING WORK

Seal Beach

Manhole rehabilitation work in the City of Seal Beach continues on approximately half a dozen manholes that need varying levels of rehabilitation extending from a couple of days at each location to a couple of weeks.

Daywork

  • Where: Intersection of Seal Beach Blvd. and Lampson Ave.
  • When:  Current – late July*
  • Work Hours: Monday – Friday; 9 a.m. – 3 p.m.

*Dates and times are subject to change due to operational factors or inclement weather.

Impacts:

  • Lane reductions as work is occurring.
  • Increased noise, mitigation measures in place.
  • Please allow extra time when traveling in this area.

We appreciate your patience and understanding as we continue to improve Orange County’s infrastructure.

STAY IN THE KNOW

Sign up for text alerts

Sign up for e-notifications (Subscribe to “Los Alamitos” in the News section)

Questions?  Construction Hotline 714.378.2965 or ConstructionHotline@ocsan.gov.

Project fact sheet.

 Project Description

OC San is rehabilitating two parallel sewers on north and southbound Seal Beach Blvd./ Los Alamitos Blvd., and along Katella Avenue, Oak Street, and Lexington Drive in the cities of Seal Beach and Los Alamitos. The work consists of removing calcium buildup at various pipe joints and injecting chemical grout to strengthen the pipe. Rehabilitation and/or replacement of over 70 manholes will also take place.

  Construction area map